This two-storey building was constructed using concrete tilt panels. It houses eight (8) beauty consultation rooms on both floors.

 

Location
Ommaney Street, Bunbury WA
Client
Private
Designer
Dane Design
Complete date
December 2012
Construction

Insulated tilt panels were used to construct the building to achieve the required green star rating. Whilst the building is small, construction using tilt panels on such a constrained/ small project, provided a number challenges in all structural elements throughout the construction process including craning, propping and back propping. 